May 2013

Last weekend of April 2013 sees the family back in Jöhstadt for 2 weeks of work (plus some R&R) on the house.

The following work is planned:

  • Complete emptying of the large barn and investigate converting it for living in.
  • Take down the toilet block and install new guttering at the back of the house.
  • Install new roof on the small barn using bitumen sheets (with 15yr gaurentee)  and paint it to preserve the wood structure.
  • Remove the straw from the top of the small barn and clear out the ground floor of all unwanted items.

R&R sees us visiting Annaberg-buchholz, an overnight trip to Prague (pubs?) and hopefully a walkabout around the area.

This entry was posted in Joehstadt, Website. Bookmark the permalink.